- Product Categories
- Plugging company
- Basement plugging
- Cesspool plugging
- Plugging culverts
- Sealing joints
- Plugging the cable trench
- Coal corridor plugging
- Tunnel plugging
- Plugging dock
- Friendly Links
| Information Name: | Bridge and culvert plugging leaks |
| Published: | 2015-02-08 |
| Validity: | 366 |
| Specifications: | Bridge and culvert plugging leaks |
| Quantity: | 432.00 |
| Price Description: | |
| Detailed Product Description: | Bridge and culvert plugging leaks 24 hours service hotline :( plugging construction hotline: 15862087268; 15151078786) plugging Engineering Co., Ltd. Jiangsu large first batch of Jiangsu Province Production Safety Supervision Bureau management qualifications a high flying job security companies, China's anti- corrosion construction power system relevant professional qualifications two companies, Jiangsu Province basement plugging the tunnel plugging, plugging cesspools, culvert trap, plugging the pool, with water plugging, plugging the dock, mine plugging, cable ditch plugging, civil air defense projects plugging, sealing joints, joint sealing, plugging cracks off, pump plugging, settlement plugging, plugging the dam, underground works plugging, plugging the elevator shaft, joint sealing, cooling tower plugging, waterproof plugging, plugging and other underwater waterproof plugging works! Professional to provide you with: (a) culvert, settlement, expansion joints and Deformation, back strip, construction joints, cracks off the bottom of sewage leaking water waterproof plugging grouting repair. (B) underground base construction, underground engineering, civil air defense projects, bank vault, floor and other concrete structures pond water leakage plugging construction. (C) mine channel, wellbore, caisson, dam, bridge, roof, tunnel, culvert, drainage works take leakage shutoff maintenance. (Iv) coal mine coal handling system, threading pipe, casing, coal handling bridge, drilling, well Wall, tailings leak sealing cracks in concrete culvert. (E) the cable trench pit, cable tunnels, cable wells, elevator shafts, wells siphon valve shafts, foundation pit engineering leak water, with water plugging operations construction. (Six) in the basement, underground garage, parking, underground passages, heat pipes, excavation, shaft and other types of underground works plugging leaks repair and construction. (Seven) of concrete structures, cooling towers, cooling towers, chimneys fouling platform, through the pump house, plumbing, sewage treatment pond seepage water trap maintenance works. (Eight) highway tunnel, tunnel, tunnel across the river, artificial lakes, water tunnels, the railway tunnel leak plugging cracks in mass concrete. ************************************************** ************************************************** Fundamentals ******************* waterproof plugging construction method used is chemical grouting. Chemical grouting is the use of manual or mechanical means, carry on with water plugging, under pressure, the special of the filling material is poured into the cracks in the structure of the building, so that cracks in the grout material solidifies in order to achieve the filling cracks and sealing purposes. Right through the cracks, you can take the sealed seam pipe, irrigation methods of treatment. Non through the cracks, because the relationship between breath, difficult to crack the slurry irrigation district steeple, and thus can not eliminate the stress concentration area formed by the tip region, so treatment should carefully consider various factors, improving slurry filling rate. For temperature crack, taking into account the temperature of the concrete building on the "lag effect", usually selected at low temperature of the concrete grouting plugging leaks water, the better. . Grouting is a new chemical grouting plugging technology, which uses double grouts. Proportionally weighed three materials add water and stir into liquid A pro rata weighed B desulfurization add water and stir into the liquid, when the two liquids mix after polymerization reaction, the initial setting of 30 seconds, 2-3 minutes, the reaction is complete, the final cemented colloids. Grouting injection structure layer using a water-soluble form, low slurry viscosity, permeability, can be injected into the cracks of 0.1mm or less; slurry in the wet, the water speed large, multi-criteria aggregation under water; gel also has good permeability, the case expansion of water, corrosion resistance and other characteristics, colloidal compressive 0.01-0.06MPa, tensile strength 0.02-0.04MPa. b. grouting method is mainly used in a large amount of water leakage, water dispersion, is not conducive to sealing cracks and individual water points, faces. According to determine the location of the crack closure status. Internal grouting to seal the water channel and cracks, or water flow is relatively concentrated, easy to block. Leakage greater than 150mL / min centralized water points, using water shutoff grouting method. The first point on the water drilling, drilling depth to not penetrate the structure layer, preferably not less than 20cm, both to avoid slurry hyperdiffusion phenomenon, but also to clear the water around the point when the deep-rooted minor fissure grouting, play relief role. Then float hole gravel ballast clean up mud to gel with the speed of 25mm outer diameter plastic hose buried water hole, then trim mortar mouth. Jiangsu large waterproof plugging plugging company is the technology research and development, construction of an integrated enterprise. Has many years of experience in construction, in recent years, the introduction of foreign advanced technology and high-performance waterproof plugging special hydraulic grouting equipment, imported high-tech nano micro molecules waterproof materials, new technology formulated scientific precision grouting plugging buck, and efficient block technological innovation, professional management of various underground leakage joints, especially for mass concrete cracks, tunneling, settlement leakage has many years of experience in maintenance treatment, complete with tough waterproof plugging ability! Over the years the company is willing to extensive construction experience, first-class technology, first-class management, first-class equipment, first-class service for the various owners of service and dedication to provide the most satisfaction, the best, the best quality service for domestic and international customers. Bridge and culvert plugging leaks |
Admin>>>
You are the 276163 visitor
Copyright © GuangDong ICP No. 10089450, Jiangsu large waterproof plugging Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 276163 visitor
Copyright © GuangDong ICP No. 10089450, Jiangsu large waterproof plugging Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
| No.13604705

