- Product Categories
- Plugging company
- Basement plugging
- Cesspool plugging
- Plugging culverts
- Sealing joints
- Plugging the cable trench
- Coal corridor plugging
- Tunnel plugging
- Plugging dock
- Friendly Links
| Information Name: | Wujiang elevator shaft plugging company specializing Welcome |
| Published: | 2015-03-22 |
| Validity: | 366 |
| Specifications: | Wujiang elevator shaft plugging company specializing Welcome |
| Quantity: | 432.00 |
| Price Description: | |
| Detailed Product Description: | Wujiang elevator shaft plugging company specializing welcome you Wujiang company specializes in elevator shaft plugging plugging, water sealing, basement plugging, plugging the pool, tunnel plugging, sealing joints, construction joints plugging, plugging the cable trench , settlement plugging, plugging mine, cooling tower plugging, plugging the elevator shaft, dock plugging, plugging the dam, pump plugging and other projects. Phone: (0) 13961999789 (0) 15862087268 plugging leakage causes and solutions: sewage treatment works most of the key structures of reinforced concrete thin-walled structures, even with the surface of the water layer and other measures, with the extension of the use of time cesspool waterproof layer surface leakage failure also occurs. Treatment for a crack crack various causes, we must make the necessary treatment, depending on the type and size of the cracks, there are several treatment methods. 1.1 surface crack repair method for small (<0.2mm), surface repair method is a simple, common repair methods. It is mainly applied to stabilize and treatment had no effect on the structure of the carrying capacity of the surface cracks. Traditional treatment measures are cracks in the surface of smear grout, epoxy mastic or painted anti-corrosion materials in the concrete surface. Now a new waterproof, anti-corrosion coatings - spherical polymer modified cementitious capillary crystalline product, has been widely used, it can still crack bridging 0.3mm below the surface of the adhesive with the construction of high-strength, weather resistance, anti-UV exposure, as long as the structure is not damaged, it is permanent. 1.2 caulking sealing method [3] to crack than 0.3mm, especially mobile crack closure is necessary to combine grouting treatment when necessary. Caulking cracks sealing method is the most common method, it is usually along the cracks gouges in the tank filled, rigid plastic or sealing material to achieve the purpose of the closure of cracks, Figure 1 is that we move cracks governance A method employed. Process: crack slotted parts, clean up loose parts, blocking legislation sealing (quick-drying cement), (if out of water, then buried polyurethane injection nozzle slurry seal), wiping flexible excellent sealing (a polymer-modified cement based waterproofing material) one after the release strengthen flexible network optimization only the surface layer of plaster. 1.3 Replacement Concrete grout for crack-intensive area, usually due to construction quality or the quality of materials (such as the occurrence of alkali aggregate reaction) resulting in partial loose, irregular surface cracks intensive, even when leakage occurs in the bottom of the cesspool, they have chiseled original concrete, combined with grouting repair. Filling aimed at repairing an impact on the structural integrity requirements or seepage cracks in concrete, it is the crack using a pressure device material into the cement in concrete, cement and concrete material hardened to form a whole, and thus play a seal blocking reinforcement purposes. 2.1 Construction Principle 2.1.1 Summary grouting a. Grouting is a new chemical grouting plugging technology, which uses double grouts. Proportionally weighed three materials add water and stir into liquid A pro rata weighed B desulfurization add water and stir into the liquid, when the two liquids mix after polymerization reaction, the initial setting of 30 seconds, 2-3 minutes, the reaction is complete, the final cemented colloids. Grouting injection structure layer using a water-soluble form, low slurry viscosity, permeability, can be injected into the cracks of 0.1mm or less; slurry in the wet, the water speed large, multi-criteria aggregation under water; gel also has good permeability, the case expansion of water, corrosion resistance and other characteristics, colloidal compressive 0.01-0.06MPa, tensile strength 0.02-0.04MPa. b. grouting method is mainly used in a large amount of water leakage, water dispersion, is not conducive to sealing cracks and individual water points, faces. According to determine the location of the crack closure status. Internal grouting to seal the water channel and cracks, or water flow is relatively concentrated, easy to block. Leakage greater than 150mL / min centralized water points, using water shutoff grouting method. The first point on the water drilling, drilling depth to not penetrate the structure layer, preferably not less than 20cm, both to avoid slurry hyperdiffusion phenomenon, but also to clear the water around the point when the deep-rooted minor fissure grouting, play relief role. Then float hole gravel ballast clean up mud to gel with the speed of 25mm outer diameter plastic hose buried water hole, then trim mortar mouth. 21.2 grouting concrete construction steps a surface treatment: the concrete surface cracks about 10cm processing net, find the location of cracks and water. . b slotted or drilled: in seepage around each 3cm gap by cutting machines at 6-8cm deep seam preparation for gouges. c gouges: artificial carved depth of 8cm (construction joints) or 6cm (liner cracks) in the slot, usually hewn large (6cm) Minor (4cm) inverted trapezoidal groove, ensuring topical waterproof layer 2-3cm thick. d embedded grouting pipe: For between water pipes and buried sleeve seam leaks, the first of leakage points chiseling depth of less than 70mm, the water washed away after installation hemp rope, and then sealing materials for closure 1-2 grouting pipe embedded diversion. . e grouting: After sealing materials such as waterproof mortar reaches a certain intensity, from the tube into the slurry grouting; grouting pipe next to the appropriate according to circumstances out of slurry grouting effect judgment strive slurry filled the gap and distribution; grouting pressure control in 0.3-0.4MPa, generally determined by field tests; after completion of grouting, grouting iron Sizha prison nozzle to prevent the outflow of slurry; Once the slurry induration, cut grouting pipe. . f swabbing leveling: waterproof mortar reaches a certain intensity, wet the repair area, brush 1: 2 ordinary mortar, thickness 0.5-0.8cm. g conservation: in principle make water conservation 2.1.3 Grouting Grouting leak point three days before the smaller water injection after injection is greater; the next ring to crack up sequentially by grouting; horizontal or diagonal cracks by water. smaller to the larger end of grouting; surface leakage from the periphery to the center in order grouting. 2.1.4 Grouting end standard considerations of surface leakage if water has effectively block principle. Technical measures to ease the closure grouting: The hole in the fabric of the existing grouting should consider plugging leakage of water, should be carried out in the grouting grouting grooming, which is to inject slurry, when there is leakage of water gradually changing the slurry overflow slurry concentration, adjust the slurry gel time, so to divert water leakage at the block by grouting from the inside out. If during grouting part leaks can not achieve the purpose of the overflow slurry, perform leakage points are located grouting hole, so as to achieve outside-filling and sealing slurries. Jiangsu large waterproof plugging company is waterproof plugging technology development, research and construction in one integrated enterprise, Wujiang elevator shaft plugging company has 40 years of construction experience, in recent years, the introduction of foreign advanced technology waterproof plugging, pressure grouting equipment, and constantly improve the waterproof plugging construction technology, and efficient block technological innovation, professional management of various underground leakage, especially for mass concrete crack leakage, tunneling, leakage plugging settlement expansion joints, has many years of The success of the maintenance treatment experience, complete with tough waterproof plugging ability is close to plugging your experts! Construction performance throughout the country .. one, tunnel Deformation (including expansion joints, settlement, construction joints, cross joints) leakage reasons: (1) the reasons for the special design of specific parts of the environment with special features, in such Deformation and other detailed structure, the lack of effective, combined with the specific circumstances of the waterproof design, resulting in leakage of these sites. (2) the reasons for the selection of materials suited to poor material deformation requirements or caulking material properties (3) failure to require the construction of water stop construction reasons, caulking sealant failure to require the construction. Second, the treatment methods: Set Deformation purpose is to absorb or buffer structure stress due to temperature differences, settlement, vibration and other factors that, in order to avoid cracking or damage to the concrete structure. Deformation have built houses in the basement due to reasons such as construction materials and water leakage situation. Due to constraints (unable excavation), can only be processed in-house engineering dorsal surface, usually grouting, caulking, paste and other methods. 1, grouting and caulking law: not bound by the original movement joint filler, surface cleaning to water stop, rinse after, that the use of speed Ningzhi water pumping pipe materials, pipe, water operations, do not fill the groove Man, in order to leave room for caulking, laying a certain distance every packer, quick-setting material reaches a certain intensity, can be elastic sealing slurry perfusion pressure by packers, has been fed to the water until no longer Deformation . Then have the upper sealing groove Deformation of filling them with the same expansion slot width rubber seal or elastic sealing material, bury or pouring concrete surface with cement mortar smooth. 2, paste method: Deformation after grouting sealing, filling them with elastic sealing material can be pasted elongation in the cement mortar protective layer, high tensile strength synthetic polymer rubber sheet. Specific practices are: cement mortar protective layer to clean, requiring the grassroots level, dry brushing the grass-roots primary treatment agent, let it dry, and cut that grass-roots level on a good brushing supporting adhesive sheet, dry to refer When the touch stick, you can paste the polymer sheet. The trailing edge of the mat on both sides of the sheet metal layering pressure to shoot nails fixed, then at the edge of sheet metal on both sides sealed with caulk to form a multi-channel waterproof fortification. The new company is a big waterproof plugging waterproof plugging technology development, research and construction in one integrated company with 40 years of construction experience, in recent years, the introduction of foreign advanced technology waterproof plugging, high pressure grouting equipment, and constantly improve waterproof plugging construction technology, and efficient block technological innovation, professional management of various underground leakage, especially for mass concrete crack leakage, tunneling, leakage plugging settlement expansion joints, has many years of successful experience in the maintenance treatment, complete tough waterproof plugging ability is close to plugging your experts! Construction performance throughout the country. Waterproof construction, professional plugging: Over the years, specialized in all kinds of waterproof, plugging technology research. Wujiang elevator shaft plugging the company in recent years, in cooperation with the Canadian company, using advanced foreign technology, making waterproof plugging construction technology better and more advanced. The company has first-class engineering and technical personnel, production and construction management, construction teams and professional construction equipment. Contract a lot of construction, underground engineering, hydraulic engineering, environmental engineering, municipal, subways, tunnels, culverts, water projects, only infiltration plugging construction, and various types of pipes, valves, flanges, tees, elbows, etc. In particular, stop leaks mass concrete cracks leaks, basement, tunnel, mine leaks and roof leaks have many years of successful experience in handling, performance throughout the construction, construction technology is leading. Polymer grouting waterproof plugging new technology: Grouting for underground civil air defense, hangars, pumping stations, pools, dams tunnel, rock foundation, trenches and other works shutoff, trapping, anti-penetration, which is a variety of chemical material formulated into A, B two-fluid, with a specific high-voltage equipment, seepage into equal parts to fill the full crack penetration leakage, no leakage in more than 20 years, our company provides specialty polymer materials and construction technical advisory services. Working with Water, anti-pressure sealing patented formula: with water operations, anti-pressure sealing. Quoted from foreign high-tech waterproof plugging technology, using imported polymer waterproof materials, will be equipped with back pressure against the mixed slurry grouting, water expansion accelerating, the elastic material used in tunnels, basements, air defense, subway, pool, tank, Thermal well chamber and mouth of a long-term settlement joint military trenches impervious waterproof plugging. Construction had been plugging the crack mouth, and later settling or dislocation cracks also no leakage. Wujiang elevator shaft plugging company specializing Welcome |
Admin>>>
You are the 276163 visitor
Copyright © GuangDong ICP No. 10089450, Jiangsu large waterproof plugging Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 276163 visitor
Copyright © GuangDong ICP No. 10089450, Jiangsu large waterproof plugging Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
| No.13604705

